Tips for Finishing Up the Project at the End

The weather is cold, will the New Year be far away. In the decoration industry, decoration at the end of the year, or New Year’s decoration, is a topic that has to be said. Whether the decoration at the end of the year is good or not, there must be good and bad. Tips: Guangzhou has a warm climate. As long as the planning is well planned and the construction is standard, the decoration before the year is not a problem. However, there are some tricks to catch up with the decoration at the end of the year.

First of all, if you decide to decorate at the end of the year, be sure not to rush and do the preliminary work responsively. For example, it is also a website. Some people can do it in a few days, while others can finish it in a few months. The decoration design is even more important. Before making a design plan, it is necessary to communicate with the designer to ensure that it is passed once. As for the decoration materials, including tiles and cabinets, they must be prepared in advance.

After getting the cabinets, we must begin to determine the water and electricity rectification plan, so that the construction can be carried out immediately after the start of construction. Generally speaking, ceramic tiles are the first to be used after construction, so when it comes to the pre-renovation period, you must first choose the cabinets and tiles. Other decoration materials should also be determined as soon as possible. For example, bathroom products and other products also need to determine the model, size or choice of office furniture.

Regarding the sequence and duration of construction: After the start of construction, the plumbers and carpenters advanced to the construction site. It takes 4 days to a week for the renovation of the water circuit. It takes about 15 days for the carpenter to make the suspended ceiling, the background wall, and the cabinets made on the spot; after about 7 days, the water circuit renovation is completed. Then shop the public part, the whole process lasts about 30 days. Get Amazon promo code NHS can save up to 10% off. Get your best NHS Amazon coupon codes, discounts, and promo codes from NHS Discount Code

In about 15 days, the woodworker completed the work, and the oiler began to enter the site to carry out the work such as scraping and levelling of the wall, woodwork and painting of the wall, which should last until two or three days before the completion of the decoration. During this time, the owner can find the furniture he likes in the market to prepare for the decoration style in the future. To sum it up, it means that after the hydropower transformation is completed, it will immediately enter the bricklayer stage, including leveling, waterproofing, and tiling.

The wall tiles in the kitchen and bathroom should be pasted up. Because the wall tiles in the kitchen cannot be pasted, cabinet measurement cannot be performed. Without specific size data, cabinet manufacturers cannot produce it. After the bathroom floor is waterproofed, a 24-hour closed water test should be done to ensure that there is no leakage, and then tile.